Projects
Greens Bayou Pipe Mill has produced pipe for most of the major oil and gas companies and nearly all the various fabricators in the offshore market. We have also fabricated pipe for many civil contractors. Greens Bayou has built a reputation for fast, on-time delivery of a wide variety of fabricated tubular steel and specialty pipe. Our robust production facilities and record for performance have made us the supplier for such demanding projects as:
Woodrow Wilson Bridge
Over the Potomac River for the Washington Beltway. Fabricated 29,800 tons of 54 inch, 66 inch and 72 inch pipes in lengths of 200 feet.
Exxon – Diana / Hoover
Fabricated all rolled tubulars for the 26,500 ton project.
PEMEX EPC-1
Fabricated all rolled tubulars, including jackets, topsides and piling, for the 50,000 ton project.
PEMEX EPC-22
Fabricated 11,400 tons of piling for the project.
EOG Resources – Oilbird Project
Fabricated 1,950 tons of jacket legs, high grade bracing, deck legs and piling.
Weeks Marine LNG Terminals
Dominion Cove Point LNG Terminal, Golden Pass LNG Terminal, Cameron LNG Terminal and Sabine Pass LNG Terminal totaling nearly 10,000 tons of large diameter tubulars.
Cotemar
7,000 tons of jacket legs, braces, piles and deck legs for PEMEX in the Bay of Campeche.
Kiewit Offshore – Peregrino Projects for Brazil
Jacket legs, skirt legs and piles totaling over 6,000 tons.
|